TFLavanda SRL
The Twist
Jan-Tore Egge · CC BY-SA 4.0 · Wikimedia Commons

The Twist

Public Buildings

Technical Details

Design
BIG - Bjarke Ingels Group (AKT II and Ramboll, structural engineers)
Subcontractor
TFLavanda SRL (structural steel and cladding support steelwork), main contractor Bladt Industries
Location
Year
2018–2019
Surface Area
-

Awards

  • Leading Culture Destinations Award for Best Architecture (2020)
  • Architizer A+Awards, Jury Winner, Architecture + Engineering (2020)
  • Domus, Top 10 Architecture Projects of the Year (2019)
  • The New York Times, "52 Places to Go" (2020)

Work Completed

  • Structural steel erection for sections of the twisted spatial truss
  • Steel support framing for the anodized aluminum cladding system
  • On-site assembly of prefabricated truss modules as the structure was launched over the Randselva river
  • Erection works carried out through the Norwegian autumn and winter, on a river crossing under construction

Short Description

The Twist is a 1,000 m² art gallery and bridge that BIG (Bjarke Ingels Group) designed for Kistefos Museum's sculpture park in Jevnaker, Norway, replacing what used to be a dead-end walk around the site with a direct crossing over the Randselva river. The building is a 60-meter steel spatial truss that twists 90 degrees along its length, built from straight rectangular and circular hollow steel sections that create the illusion of a smooth, double-curved form. AKT II and Ramboll engineered the structure, roughly 380 tonnes of steel in total, fabricated and erected by Bladt Industries as main steel contractor. Clad in anodized aluminum outside and lined in white timber slats inside, The Twist opened in September 2019 and has since become one of the most photographed contemporary museum buildings in Scandinavia.

TFLavanda's crew worked on site as a structural steel subcontractor to Bladt Industries through the autumn and winter of 2018 into 2019, erecting sections of the twisted truss and the steel framing that carries the aluminum cladding. The photos below follow that stretch of the build: raising the straight portal-frame modules on the south bank, working through the twist section as it was launched out over the river, and fitting the steel support work for the cladding and insulation before the panels went on.